TDA Logo

PROJEK MASS RAPID TRANSIT LALUAN 2 : PUTRAJAYA LINE: SY207 – ENGINEERING, PROCUREMENT, CONSTRUCTION, TESTING & COMMISSIONING OF AUTOMATIC FARE COLLECTION SYSTEM

06 Oct 2021

IP1 : Collaboration with CONTENT CAPITAL :

ICP PROVIDER: INDRA SISTEMAS AND RASMA CORPORATION CONSORTIUM (IRCO)

ICP RECIPIENT: CONTENT CAPITAL SDN BHD

PROJECT DESCRIPTION:

This project is to enable maximization of local content through service and local sourcing of parts and components. These activities will provide platforms for the local company to contribute to the development, production,and service of main AFC equipment under Main Procurement Contract..

The Local recipient for this project is Content Capital Sdn Bhd.Theirscope of works includes:

a) Supply of AFC equipment:

b) Local assembly of parts and components 

c) Establishment of assembly plant and storage 

d) Support in Inspection, Testing and Commissioning, QA, and QC, etc.

IRCO has provided all the necessary support and training to Content Capital team, during every stage of their works. This will aid Content Capital to develop the know-how knowledge related to MRT2 AFC project. In addition, continuous supervision by IRCO experts will guarantee that all works, and supplies are being handled as per defined/required procedures with the highest quality possible. 

Furthermore, local service and assembling of components in Kuala Lumpur has facilitate and improve the project execution, maintenance services and monitoring of the system. It will mainly consist in a set of activities, to be fully defined, including equipment supply and assembling, software and hardware configuration, testing and commissioning, maintenance, etc. 

THE FOLLOWING LOCALIZATION TASKS HAS BEEN CARRIED OUT:

a) Major services have been carried in the facility included inspection, testing and commissioning, software installation and quality procedures at the rented facility in Shah Alam for equipment warehouse and production/ assembling works.


b) Local technical team has been trained for the specific works, before starting and during the execution. This is a very important element to promote a knowledge-based economy in which local professional will acquire skills that could be used in future projects.


c) In addition, through this ICP project, the local team will be able to acquire the knowledge and skills related to AFC in the context of their scope of work and beyond, as IRCO experts has supervising and monitoring closely. This will allow Content Capital to be prepared for further opportunities and even successfully participate or collaborate in other bids and trade in the region.


d) IRCO Engineers has technically supervise the whole process and tasks to guarantee that the defined/required procedures are properly followed and implemented.


e) Quality control throughout all processes.

PROJECT DELIVERABLES

This ICP project deliverables are the same deliverables under Main Contract pertaining Content Capital scope of works. Therefore, the scheduling of this ICP project if reflecting IRCO’s Main Contract milestones and key dates.

 MILESTONE

Engineering, Procurement, Manufacturing & Assembly, System Integration Works, T&C for AFC Equipment for following AFC system: 

a) Ticket Vending Machine (TVM) 
b) Standard / Wide Gate 
c) Token Dispenser Machine (TDM) 
d) Spares 

Activities 

Block A: Manufacturing and Delivery 
a) Phase 1 Manufacturing and Delivery 
b) Phase 2 Manufacturing and Delivery 
c) Spare Parts Delivery 

Block B&C: Local Assembly, Testing and Commissioning (T&C) 
a) Phase 1 Assembly and T&C 
b) Phase 2 Assembly and T&C 

Block D: Rental of Assembly Plant 
a) Rental Scope 

BENEFITS TO MALAYSIA 

a) Malaysia will acquire capabilities within the domains of Automatic Fare Collection (AFC) and IT Systems. 

b) Acquisition of the knowledge to support the systems procured within the main contract throughout its service life cycle. 

c) Establish a sustainable and methodological and technological base to give the opportunity to develop not only the railway industry but other industries making local companies able to compete in the international market. 

 

Author:Wan Nuraryna Syahira Mohd Marzuki 
Wan Nuraryna Syahira Mohd Marzuki
Share:
All rights reserved 2021 Technology Depository Agency Berhad. Web Design
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram